STREETS:
-
Staff
repaired street lights on East & West Main
Street
-
Staff
Installed a new stop sign at East Lincoln Ave
& Chesapeake St.
-
Staff
Cleaned East & West Main Street
-
Staff
Decorated the Community Center for Christmas
WATER:
-
Staff
replaced the multi-media in the roughing filters
with sand & anthracite and those filters are
continuing to operate much better
-
Staff
is working with the rehab contractor related to
the 500,000 gal. storage tank and the recoating of
the interior of that tank
-
Staff
has taken the drinking water lead & copper
samples as a follow-up to the January-June 2004
period samples
-
The
contractor has completed the demolition of the old
water treatment plant
-
Water
production & Consumption: We produced
and purchased an average of 33,390 gpd. We
consumed an average of 327,706 gpd. Up due
to a major leak at the Provincial House. The
difference is "Back wash water" ---
(2%). Due to the rehab of the 500,000 gal
storage tank we purchased 1,779,530 gals. of water
from MSM this month.
-
52%
of this water came from wells; 21% came from Mt.
St. Mary's and 27% came from Rainbow Lake.
WASTEWATER
-
Staff
has been performing general/seasonal maintenance
at the wastewater treatment plan.
-
Staff
has been preparing equipment for snow removal
-
We
received 3.9 inches of rain this month
-
We
did have two sewerage spills in the month of
December --12/09 & 12/10 .. 35,000 gal., and
12/24 .. 6,000 gal.
-
Wastewater
Treatment: We treated an average of 765,000
gpd (consumed 327,706 gpd). Which means that
57% of the wastewater treated this month was
"wild water"
-
We
did exceed the plants design capacity on 9 days in
the month of December:
-
12/01 -- 1,391,000 gal.
-
12/02 --
853,000 gals.
-
12/07 --
825,000 gal.
-
12/09 -- 1,670,000 gal.
-
12/10 -- 2,296,000 gals.
-
12/11 -- 1,154,000 gal.
-
12/12 --
803,000 gal.
-
12/23 -- 1,520,000 gals.
-
12/24 --
920,000 gal.
TRASH
-
Trash
pickup days will be Monday & Thursday for the
month of January
PARKS
-
Staff is performing standard winter maintenance
List of prior