Town Manager's
Report
August 2005
Prepared by David
Haller
Streets:
- Staff installed a
speed bump on South Jamison Avenue
- Staff repaired a
number of street lights
- Staff has been
repainting yellow curbs
- Staff has
installed 15 mph speed limit signs in Pembrook and
Silo Hill
- The Town has
arranged with Allegheny Power to have new street
(pole) lights installed on Armstrong and Stoner
Lanes (no installation fee & a monthly fee of
$15 per light)
Water:
- Staff has again increased
the flow from Rainbow Lake to 120 gpm which has
reduced the draw on the wells
- Staff has again
flushed the raw water line from Rainbow Lake to
the water treatment plant
- Staff found and
repaired a major water leak (about 50 gpm)
- The high particle
counts in the raw lake water caused by the high
algae counts are being controlled by applying
copper sulfate which seems to be helping
- Water production and consumption. We
produced and purchased an average of 424,780 gpd.
We consumed an average of 379,293 gpd.
- The difference is "Backwash Water"
...(10.7%). We purchased 555,290 gals. of water from MSM this month.
- 55.0% of this water came from wells
- 04.5% of this water came from Mt. St. Mary's
- 40.5% of this water came from Rainbow Lake
Wastewater:
-
We didn't have any
raw sewerage spills in the month of August
-
Staff has been
performing general / seasonal maintenance at the
wastewater treatment plan
-
The "overland
flow" treatment system is in use and working
well and the irrigation system is running
-
We received about
3.5 inches of precipitation this
month
-
Wastewater Treatment:
- We treat an average of
365,000 (consumed 379,293 gpd) which means that
0% of the wastewater treated this month was
"wild water"
- We exceeded
the plant's design capacity on 0 days in the
month of August
8/16 861,000 gal.
Trash:
-
Trash
pickup days will remain Monday & Thursday for the
month of September
Parks:
-
Staff is performing
standard maintenance - on all
playground equipment, ballfields and mowing
and trimming
-
Staff has been
working on the swimming pool - installing new
table umbrellas and repairing lights
Meetings Attended:
- With Frederick
County Parks & Rec. related to our after
school program
- The bid opening
for the Brookfield water pressure reduction valve
project
- With the
contractor related to the completion of the public
improvement work at Southgate
- With staff to
review and calculate the remaining improvement
guarantees for Southgate
List of prior
months' Town Manager's reports |
|
|
|
|