Town of Emmitsburg
300A S. Seton Ave Emmitsburg, Maryland
21727
240-629-6300
|
|
|
Town Manager's
Report
July
2009
Prepared by
David Haller
Streets:
-
Staff cold
patched some pot holeson West North Ave
-
Staff
installed the new post, stop & street sign on
Stoner Lane for the second time in recent months
-
Staff repaired
a number of street lights
-
Staff
cleaned East & West Main Street
Water:
-
Rainbow Lake
is now full and holding at the spillway level, but may
soon begin to drop
-
The roughing
filters are now being backwashed twice per day
and the DE filters are being done once per week
-
Staff has
applied copper sulfate to Rainbow Lake
-
We are nearing completion and final
hook-up of the generator project at well #3
-
-
Water
production and consumption. We produced and
purchased an average of 349,200 gpd. We consumed
an average of 285,900 gpd
-
The
difference is "Backwash Water" ...(18.1%)(*). We purchased
354,950 gals.
of water from MSM this month.
-
46.9% of this
water came from wells
-
3.3% of this water
came from Mt. St. Mary's
-
49.8% of this
water came from Rainbow Lake
-
(*)
Staff is performing an inspection of the plant as we
may have an internal leak which this number appears
to indicate
Wastewater:
-
The overland
and flow treatment system is now up and running for
the season
-
Staff has
been discharging to the irrigation system at Mason
Dixon Farms this month
-
We received
about 3.8 inches of precipitation this month (the
average is 3.6 inches)
-
Wastewater
Treatment:
-
We treated
an average of 289,000 gpd (consumed 285,900 gpd)
which means that 01.1% of the wastewater treated this
month was "wild water".
-
We
experienced no spills of untreated sewerage
during the month of May
-
We did not
exceed the plant's design capacity during the month
of July
Trash:
Parks:
-
Staff
"drug" removed weeds from the major softball
field in Community Park
-
Staff removed graffiti again in Community
Park, this time it was the sliding board
-
Staff
performed the monthly maintenance inspection
-
Staff
performed some caulking and painting in the Memorial
Park Bathrooms
-
Staff
removed the old play-ground equipment from Community
Park
Meetings
Attended:
-
07/01
Staff held a Shelter In Place meeting
-
07/08
Meeting with the design engineers for the proposed
Emmit Gardens water plant
-
07/10
Meeting with Fox & Associates related to Lincoln
Ave. project
-
07/13
General staff meeting
-
07/14
Meeting with Sue Cipperly and the proposed developer
of a store site
-
07/16
Meeting with Sue Cipperly related to comprehensive
plan update
-
07/16
Met with Frederick County Commissioners and municipal
leaders monthly meeting
-
07/21
Met with Frederick County Building Management staff
-
07/22
Mayor's staff meeting
-
07/24
Met with Sue Cipperly and staff from the Provincial
House
-
07/29
Met with staff related to Grease Trap ordinance
list